CANAL.

Estimates and preparatory studies for canals (1014. 1015).The canal which may be 16 braccia wide at the bottom and 20 at the top, we may say is on the average 18 braccia wide, and if it is 4 braccia deep, at 4 dinari the square braccia; it will only cost 900 ducats, to excavate by the mile, if the square braccio is calculated in ordinary braccia; but if the braccia are those used in measuring land, of which every 4 are equal to 4 1/2 and if by the mile we understand three thousand ordinary braccia; turned into land braccia, these 3000 braccia will lack 1/4; there remain 2250 braccia, which at 4 dinari the braccio will amount to 675 ducats a mile. At 3 dinari the square braccio, the mile will amount to 506 1/4 ducats so that the excavation of 30 miles of the canal will amount to 15187 1/2 ducats.